Main Maintenance facility parking x
Project Details
- The Target of the Project:
- Provide foundation for two-part concrete paving:
- Part One:
- Preparation of soil.
- Provide, grade, and compact sub-base installation.
- Concrete paving with 8-inch (20 cm) 4000 psi compressive strength concrete slab.
- Approximate area: 53,170 sqft (4,949 sqm).
- Two layers of reinforcing steel.
- Part Two:
- Pouring 6-inch (15 cm) 3500 psi concrete slab.
- Approximate area: 20,350 sqft (1,891 sqm).
- Designed concrete structure.
- Provide and install 3 sliding doors at the entrance.
- Prime contractor: KBR
- Subcontract No: 02H8-US-SJ00263
- Contract value: $329,000.00
- Date of completion: 25/11/2005
- Beneficiary side: USA Army
- Subcontractor: Al-Mubarak International Group
- Location: International Zone Area – Baghdad – IRAQ
- Date of Start: 01/10/2005
- Duration: 55 days
Work Details
- Civil Works:
- Site preparations.
- Leveling of the site.
- Concrete foundation.
- Steel reinforcement work.
- Applying crushed stones on the floors.
- Mechanical Works:
- Supply and install 3 sliding doors (6 m each).