MRE Warehouse Renovation x
Project Details
- Civil & Mechanical Works:
- Supply and install interior sandwich panel walls with temperature insulation for an area of 360 sqm, covering the hall building to maintain constant warehouse cooling temperature.
- Supply and install 2 package units with a capacity of 25 tons (LG Type).
- Supply and install steel plate air distribution ducts with a length of 200 ML, including temperature insulators.
- Supply and install an additional 80 meters of air distribution ducts to cover managers’ and staff offices.
- Supply and install air distributors.
- Furnish and install all roof structural elements of the building, including repairs to:
- Beams.
- Angle irons.
- Roofing panels.
- Drop ceiling framings.