Numaniyah Divisional Training Center, Iraq x
- Beneficiary side: USA ARMY Groups of Engineer
- Contractor: Mubarak Int Group Ltd.
- Location: Numaniyah (Wassit Provinces – Iraq)
- The Target of the project: Provide training facilities for Iraqi Military.
- Our works consisting of the following and all item In BOQ & SOW (TURN KEY PROJECT):
- Design. Including AutoCAD drawings and design calculations.
- Clear and grub the level of construction site.
- Supply and install the shoot house made of modular through-hardened armor steel panels with Brinell hardness rating of 500 and a thickness of no less than 3/8 inch.
- Construction of 6 m high Berms in a manner that surround the shoot house.
- Facilities on all four sides4-Site preparation.
- Construct 6m high berms quantities of 1200 LM.
- Construct 9m high beams quantities of 1400 LM.
- Construct Access and service roads quantities 40000 M².
- Construct 7000 M² Metal overhead sunshades.
- Construct 1000M² Sunshades/outdoor training Stage.
- Construct 1900M² OTFs.
- Supply and install 4 each of security tower.
- Supply and install 7 each of power generator.
- Supply and install 3 bathrooms container trailer.
- Construct 4 steel building used as storage for Iraqi army area approximately 3200 M² including all electrical and mechanical work and all civil work.
- Supply and install power transformer.
- Construct Full System COMBAT ASSAULT COURSE REQUIREMENTS.
- Construct Chain link fence 2200 ML.
- Target storage/admin building 3 EA.
- Construct range control towers 4 EA.